After Grading and Forming for this 27 Yard Circular Driveway, Reinforced Wire Mesh is placed for Maxium Strength.
After Pouring Concrete, we Edge, Joint and Finish Concrete. Then we spray a retarder on this slab which stops the top 1/4 inch from drying so that we can latter wash off upper layer to give a Beautiful Exposed Agrigate Finish.
We then Spray off the Surface to reveal an Exposed Agrigate Finish.
We Built this Small Roof for a Patio Swing with Post Embeded into Concrete,
Have a Question? Need a Concrete Patio Side Walk or Driveway Poured? Call: Michael Siemer @ 423-508-2743
God Bless,