· Implemented lean manufacturing principles in design, development, and deployment of a common electronic controls theme for all PC based CNC and PLC applications leveraging one supplier for all applications.
· Provided common platforms for all assembly applications, which increased productivity and throughput as machine troubleshooting time was reduced by 50%.
Co-Champion Electronic Controls Web Site
Assisted in the design, development, and the implementation of web-based electrical / controls web site to include machine tool purchasing standards for tier one suppliers when quoting machine tool builds.
· Worked closely with the IT organization to integrate the controls web site into the Ford Intranet.
· Assisted in the development of web site links to assist tier one suppliers to quote, design, and build to required specifications.
· Significantly improved machine tool procurement delivery time.
Lead Engineer Power Distribution
Provided assistance in power distribution installations at the plant level. Technical assistance was provided to plant engineering personnel in required power distribution upgrades.
Championed Global 8D and FMEA Campaigns
Global 8D and FMEA analysis was implemented to reduce electrical control failures and reduce machine tool process complexity.
Lead Engineer for Material Part Specifications
Data driven R&M process was used to implement critical spare commodities for Global Transmission Operations in supporting plant machine tool applications.
· Spearheaded an aggressive campaign for different plant operations to share and procure duplicate commodities. By specking duplicate commodities, part inventory was reduced by 30% - 50%.
FORD MOTOR COMPANY, Livonia, MI 1984-1995
Livonia Transmission Plant, Supplier Automatic Transmissions to Vehicle Operations.
Controls Engineer B, Livonia Transmission Plant
Project Leader in the design and development of an electronic lab facility to support manufacturing machine tool applications on the plant floor.
Lead Controls Engineer B, Process Complexity Reduction
Lead a team of engineers and skilled technicians in identifying process bottlenecks on a major machining transfer line.
· Converted high failure rate motor and gear box turnaround station applications with less complex and costly hydraulic units.
· High efficiency fluid power hydraulic units provided added uptime and reduced hardware costs recognized at $115,000 annual.
TEXAS INSTRUMENTS, INCORPORATED, Sherman, TX 1982-1984
Manufacturer of Integrated circuits supplied to the military.
Process Engineer
Process Engineering responsibilities for the failure analysis of integrated circuits during management quality reviews.
· Responsibilities included the root cause and prevent occurrence of failures at the multiprobe level.
· Analytical tools were adopted to identify failures and implement best practices to prevent occurrence.
EDUCATION
BAS, Electronic Engineering Technology, Siena Heights University, Adrian MI 1988
ADDITIONAL TRAINING