Observatory Construction
|
The great day. Dome arrival. How sweet it is. This is where the future images of my new Explora Dome observatory will be posted.
Rodney
|
|

Site prep and pier hole dug
|
|

Pier tube installed and conrete pour is next, what I do not have in the image(s) is the rebar and footer.
|
|

Pier installed and leveled. The three rods in the concrete act as leveling points.
|
|

Somewhat finished product. This was all done in one day. 15 hours straight of building by myself. Oddly I can not find my in between images I took during the pier to this phase. When I find them I will post them.
|
|

Scope mounted and ready for business.
|
|

Here is a different shot 6 months later. New steel door intalled. Lattice was put up in a hurry and after a few beers. Front step was level until a pounding rain washed out the paver base and paver sand. Redo in the spring.
|
|

Scope now has a 80mm/F11 guidescope on the back, the dome was painted balck on the inside to limit my annoying neighbors front porch spotlight. There are now a full wall of lockable cabinets. The pier was extended to allow me greater access to the horizon.
|