All of these pictures are when the layout was being built, all the baseboards have been built, and the track work is coming along nicely. Due to the high temperature at the moment, the attic is very warm so we can't do much at the moment in time! But we try to do some when the temperature is durable!
|
|
Preston Station looking North
|

|
|
Preston Station looking South
|

|
|
Pendolino waiting to depart
|

|
|
This beam will hopefully be transformed into the road going over the railway lines at the end of the station

|
|

Just had its Front pipes and hoses supplied with it installed. The plough has also been replaced with the complete one, this was also included. We haven't installed them on the back beacuse we have left the coupling on.
|
|

These where sprayed for us by a freind. They are to go with the Mill which will be called, ACE Mill.
|
|

We have began to start the sidings that will be hidden behind the retaining wall.
|
|

We have began to lay out and plan the Depot. We will have a three line shed, and two of those lines will have catenery as well as two sidings.
|
|
|