No progress so far, what do you expect! i've drawn up a draft timetable plan along the lines of (see below).
September 2008 - Main Boards to be completed with backscene boards. Commencing of Track laying by local p + w gang and see what space i got left on the board for additional siding space.
October 2008 - Completion of the Track laying, testing and wiring for DCC (ready for system to be installed). Seep Point motors to be bought with the board ready for fitting.
Novemeber 2008 - DCC system to be bought and wired up, Point motors to be installed maybe on DC operation or wired through DCC point modules to be operated through the system. A start on the Ballasting....
December 2008 - Not much expected to happen due to the festive holidays, will probably buy a few odd things such as odd wagons and maybe a loco depending on how generous i feel at the time =P
January 2009 - Hoping to make a start on the Scenery side of things, finish off the ballasting etc.
TIMETABLE IS WAY WAY OUT, SEE NEWS PAGE FOR REASONS WHY!!!
Or SEE ABIDALE YARD page that way <<<<<<<<<<<<<<<