My NJ Renumbering scheme + New Routes
|
New Route |
Old Route/Description of New Route |
|
US 1 |
US 1 |
|
|
|
|
NJ 2 |
NJ 49, US 130, NJ
171 up to Sandford St., Commercial Ave. between |
|
NJ 3 |
NJ 3 west of 495, NJ 495 east of 3. In addition, the route 3 designation would continue through the Lincoln Tunnel, the Mid-Manhattan Expressway in NY which should be built, the Queens-Midtown Tunnel, and the LIE (the existing NY 3 would be renumbered). Now this is really pushing it, but the Orient Point-Watch Hill Bridge should be built along with an LIE eastern extension. If all that happens, then the whole thing can become I-495 again, and 3 would end at 495. J |
|
NJ 4 |
NJ 4 east of 208, NJ 208 |
|
NJ 5 |
NJ 5 |
|
NJ 6 |
New route. Ties in
to DE 6 via a bridge between Sea Breeze NJ and Woodland Beach DE, and be a
freeway south and east of Vineland east to my proposed NJ 14 freeway; east of
there the road continues east to NJ 72 in the Long Beach Island area as a
four-lane road. Of course, DE 6 would also be upgraded to a freeway between
the bridge and DE 1. NOTE: I would like to see an extension of Interstate 70
into NJ. If that happens, I-70 would run along this road from the new |
|
NJ 7 |
NJ 7-Hudson |
|
NJ 8 |
NJ 7-Essex |
|
US 9 |
US 9 |
|
US 9W |
US 9W |
|
NJ 10 |
NJ 10 |
|
NJ 11 |
NJ 70 if Interstate
70 ever makes it into |
|
NJ 12 |
NJ 12 |
|
NJ 13 |
NJ 13, |
|
NJ 14 |
New freeway paralleling US 40; east of my proposed NJ 6, this would be Interstate 70 if I-70 ever makes it to NJ, which I’d like to see. NJ 14 would then run between I-295 and NJ 6. |
|
NJ 15 |
NJ 15, |
|
NJ 17 |
NJ 17 north of NJ 3 |
|
NJ 18 |
NJ 18 (should be completed south to Brielle and north to I-287-which is being renumbered at that particular point) |
|
NJ 19 |
NJ 19 |
|
NJ 20 |
NJ 21, |
|
US 22 |
US 22 |
|
NJ 23 |
NJ 23 |
|
NJ 24 |
NJ 24 freeway from I-78 to CR 510, CR 510 west to CR 513 (510 dies), CR 513 to Long Valley (multiplex), CR 517 to Hackettstown (multiplex), NJ 182 |
|
NJ 24C |
NJ 24 freeway between CR 510 and I-287 |
|
NJ 26 |
NJ 26, |
|
NJ 27 |
NJ 27 |
|
NJ 28 |
NJ 28 (an eastern
extension of the route into |
|
NJ 29 |
NJ 29 north of “I-95_2” (to become I-295) |
|
US 30 |
US 30 |
|
NJ 31 |
New freeway
connecting existing NJ 31 and “I-95_2” (to become I-295) north of |
|
NJ 32 |
Current NJ 32, CR 612 east to Jamesburg, NJ 92 Turnpike Extension which must be built NOW |
|
NJ 33 |
NJ 33 east of US 130 |
|
NJ 34 |
NJ 34, NJ 35 south of Brielle |
|
NJ 35 |
NJ 35 north of Brielle |
|
NJ 36 |
NJ 36 from Hazlet
to |
|
NJ 37 |
NJ 37, new highway
west of Lakehurst to |
|
NJ 38 |
NJ 38, CR 530 (530 gets killed) |
|
NJ 39 |
NJ 162; |
|
US 40 |
US 40 |
|
NJ 41 |
NJ 41 |
|
NJ 42 |
NJ 42 from ACX to Williamstown |
|
NJ 43 |
NJ 33 west of US 130 |
|
NJ 44 |
NJ 44 |
|
NJ 45 |
NJ 45 |
|
NJ 46 |
US 46 |
|
NJ 47 |
NJ 47 |
|
NJ 48 |
NJ 48 |
|
NJ 50 |
NJ 50, CR 563 north
of |
|
NJ 51 |
CR 522 west of US
130, |
|
NJ 52 |
NJ 52 |
|
NJ 53 |
NJ 53 |
|
NJ 54 |
NJ 54, |
|
NJ 55 |
NJ 55 (should be
extended to |
|
NJ 56 |
NJ 56 |
|
NJ 57 |
NJ 57 |
|
NJ 59 |
NJ 59 and more. See the NJ 59 entry in the My Proposed Routes page for more information. |
|
NJ 60 |
New freeway between
the |
|
NJ 61 |
Ridge Road section
of NJ 17, |
|
NJ 62 |
NJ 62 |
|
NJ 63 |
NJ 63 |
|
NJ 64 |
ALL of CR 571, except for NJ 133 around Hightstown, and uses Milford Rd. south of NJ 33 to meet up with 571 again. 571 dies. |
|
NJ 66 |
NJ 66 |
|
NJ 67 |
NJ 67 |
|
NJ 68 |
NJ 68 |
|
NJ 69 |
New route
connecting US 1 in South Brunswick to |
|
NJ 70 |
NJ 70. If
Interstate 70 ever makes it into |
|
NJ 71 |
NJ 71 |
|
NJ 72 |
NJ 72 |
|
NJ 73 |
NJ 73 |
|
NJ 74 |
NJ 74 freeway in |
|
NJ 75 |
NJ 75 freeway in |
|
I-76 |
I-76, NJ 42 between
I-295 and ACX, |
|
NJ 76C |
NJ 76C |
|
NJ 77 |
NJ 77 |
|
I-78 |
I-78 west of NJ Turnpike (I-95) |
|
NJ 79 |
NJ 79 north of
Freehold, CR 537 from Freehold to |
|
I-80 |
I-80 |
|
NJ 81 |
NJ 81 |
|
NJ 82 |
NJ 82 |
|
NJ 83 |
NJ 83 |
|
NJ 84 |
NJ 440-Middlesex County Section (will be signed E-W). Plus, The Korean War Vets Parkway should be completed to the SIE and designated NY 84 (yes, I know there’s a conflict, but NY 84 and I-84 won’t even come close to each other-other states do it too [MD, DE]—of course this would all be NJ 84 if Staten Island ever joins NJ). The route 440 designation would terminate at the WSE-KWVP interchange. |
|
NJ 85 |
NJ 124, Market St./Market St.-Raymond Blvd./Ferry St.-Raymond Blvd. in Newark, US 1&9 Truck between US 1&9 and NJ 440 (multiplex), Communipaw Ave. and Grand St. in Jersey City |
|
NJ 88 |
NJ 88 |
|
NJ 90 |
NJ 90 (extend to NJ Turnpike-NJ 700, which will change). Also, PA should complete the Pulaski Expressway and designate it PA 90. |
|
NJ 91 |
NJ 91, |
|
NJ 93 |
NJ 93 |
|
NJ 94 |
NJ 94 |
|
I-95 |
I-95 via NJTP Penn. Extension, NJTP north of exit 6 and NJTP Western Spur (I-95W) |
|
NJ 95E |
NJTP Eastern Spur, for internal purposes only. Would not be signed to avoid confusion. |
|
NJ 96 |
CR 505 between |
|
NJ 97 |
NJ 138, I-195, NJ 29 between I-295 and “I-95_2” (to become I-295) |
|
NJ 98 |
CR 539 (539 gets killed) |
|
NJ 99 |
New route that
would snake its way from South Jersey to |
|
NJ 100 |
New Jersey Turnpike south of Exit 6 (NJ 700) |
|
NJ 101 |
Business |
|
NJ 102 |
NJ 156 |
|
NJ 103 |
NJ 120 |
|
NJ 104 |
NJ 4 west of NJ 208 |
|
NJ 109 |
NJ 109 |
|
NJ 115 |
NJ 181 |
|
NJ 119 |
NJ 139 (truncated to I-395—see below) |
|
NJ 122 |
NJ 122 |
|
NJ 128 |
NJ 439 |
|
NJ 129 |
NJ 165 |
|
NJ 131 |
NJ 31 north of new NJ 31 freeway |
|
NJ 133 |
Business NJ 33 |
|
NJ 136 |
NJ 36 between
Eatontown and |
|
NJ 139 |
NJ 187 |
|
NJ 140 |
NJ 140 |
|
NJ 143 |
NJ 143 |
|
NJ 146 |
Warren CR 620 from
NJ 46 (originally US 46) to downtown |
|
NJ 147 |
NJ 147 |
|
NJ 152 |
NJ 152 |
|
NJ 154 |
NJ 154 |
|
NJ 161 |
NJ 161 |
|
NJ 164 |
CR 571 through the Hightstown area |
|
NJ 176 |
|
|
NJ 178 |
NJ 173 |
|
NJ 179 |
NJ 79 south of Freehold |
|
NJ 184 |
NJ 184 |
|
NJ 185 |
NJ 185 |
|
I-195 |
I-287 from NJ
Turnpike to between exits 10 and 12, |
|
NJ 197 |
NJ 129 |
|
US 202 |
US 202 |
|
NJ 209 |
NJ 166 |
|
NJ 219 |
NJ 139 Upper Level |
|
NJ 246 |
NJ 159 |
|
NJ 247 |
NJ 347 |
|
NJ 254 |
NJ 183 |
|
NJ 276 |
NJ 168 (remember, I-276 doesn’t enter NJ!) |
|
I-280 |
I-280 |
|
NJ 284 |
NJ 284 |
|
I-287 |
I-287 north of between exits 10 and 12 |
|
I-295 |
I-295, “I-95_2”
(the current stretch of I-95 between |
|
NJ 297 |
NJ 175 |
|
NJ 302 |
NJ 179 |
|
NJ 309 |
NJ 157 |
|
US 320 |
New route. See the |
|
US 322 |
US 322 (truncated
to west of |
|
NJ 346 |
NJ 163 |
|
I-395 |
I-78 east of NJ
Turnpike (I-95), Freeway upgrade between current NJ 139 (renumbered 119) and
Holland Tunnel, through Holland Tunnel. Also, NY should build the Lower Manhattan
Expressway, and sign I-395 along that, the |
|
NJ 400 |
|
|
NJ 401 |
NJ 444R |
|
NJ 402 |
NJ 444S |
|
NJ 409 |
NJ 167 |
|
NJ 413 |
NJ 413 |
|
NJ 422 |
NJ 324 |
|
NJ 440 |
NJ 440-Hudson
County Section (this would become NJ 65 if |
|
500-series county routes |
All the same except where noted above |
|
CR 587 |
New route. See the CR 587 entry in the My Proposed Routes page for more information. |
|
600-series county routes |
All the same. Same
goes for |
|
I-676 |
I-676 |
|
700-series county routes |
No change at all for those counties who have these routes |
|
NJ 700 |