Chris Mugge stands
high atop the green energy revolution — literally. The 37-year-old
project site supervisor for wind energy developer Vestas travels the
country assembling and maintaining 250-ft.-high turbines. "It used to
be small companies putting up 10 turbines," Mugge says. "Now major
utilities are putting up wind farms — and they do things in a big way."